History
Lawrence Fuller dug his first septic system by hand, mixed powdered cement, formed his first septic tank, and poured it in the ground. The drainfields were hand dug and laid with terra-cotta tiles and gravel. The job was completed in a week and he was paid $6.00.
Specialties
Residential, Commercial, and Industrial Septic System Installation and Repair Drain Field Replacement Sewer Lines Septic Tank Cleaning Dump Truck and Back-hoe work Footers and Foundations